Southampton flood defence: Plans for £42m scheme drawn up

Southampton flood defence: Plans for £42m scheme drawn up

BBC Local News

Published

BBC Local News: Hampshire -- The scheme, on the west bank of the River Itchen in Southampton, is expected to be completed by 2027.

Full Article