Traffic resumes on Mughal Road in Poonch after snow clearance
Traffic movement resumed after snow clearance operations on Mughal Road connecting Shopian to Bafliaz in Poonch. High-altitude road..
ANI
Traffic movement resumed after snow clearance operations on Mughal Road connecting Shopian to Bafliaz in Poonch. High-altitude road..
Atal tunnel in Himalayas is ready to open soon. "With this tunnel 46 kilometer is reduced and the saving of time is four hours...