Here you see the Super C Number 1 train moving into the yard at 15mph scaled however the train is to long to fit in the yard so the train has to be broken up and the cars have to be loaded then the train will be off again.
Here you see the Super C Number 1 train moving into the yard at 15mph scaled however the train is to long to fit in the yard so the train has to be broken up and the cars have to be loaded then the train will be off again.
Here you see Super C train number 3 as on dispatch papers now as it roles out of San Diego Yard out to Arizona as it's..
Here you see the Super C Number 1 Train moving fast to get to San Diego to load her cargo then head back up to through San Diego..